Your cart is currently empty!
Built When Ordered
Production Time: 2 to 3 days
The TW-S-T-4-L will be automatically added to our production queue when it is ordered.
PRICE : $18.20
Fast Tracks TwistTies provides the modeler with a way to build low cost, realistic looking, and accurate S #4 curved or straight turnouts with ease using all wood tie construction with spikes & rail. No soldering is required! Combined with our TwistTie fixed and flexible crosstie strips, you can finish all your trackwork in no time! Each TwistTie is laser cut as a single-piece lattice of pre-spaced, pre-drilled wood ties that:
- Can be curved to fit any desired radius while maintaining the turnout size
- Include pre-drilled spike holes that ensure accurate gauging & geometry
- Makes turnout construction faster & easier than traditional methods
- Takes the guesswork out of hand laying curved & straight turnouts
- Includes etched guidelines to verify rail location
- Pre-spaced ties eliminate tie laying tedium
- Uses stainable wood ties
- Are NMRA compliant
TwistTies are cut from Baltic Birch plywood custom sawn in Finland specifically for Fast Tracks. Like the prototype, the wood grain on our TwistTies runs perpendicular to the rails. The ties are 0.1" (2.5mm), 7 scale inches thick and 0.14" (3.6mm) 9 scale inches wide. They will match all popular commercially available wood ties, including wood ties available from Fast Tracks. The ties will also match all popular commercial track and our line of QuickSticks. Each TwistTie can be used to construct one S #4, Left hand turnout using code 70, 83 or 100 rail and are designed to work with Micro Engineering small spikes. If you order Fast Tracks TwistTies, we highly recommend that you consider purchasing a matching Frog Helper soldering jig and PointForm tool. This will make the construction of the frog and switch points much easier. You may also consider adding some of our CopperHead PC Board turnout ties (for the throwbar) to your order. If you are building curved turnouts, the rail will need to be pre-formed. Our Rail Roller bending tool will make this easy.
Note: Using our Assembly Fixtures, you will always get better and faster results with less effort. However, if you only need to build a small number of turnouts, curved turnouts of any radius, or if you prefer all wood tie construction, then TwistTies may be a better option for you.
This product is part of our Craftsman Series of tools designed for modelers who want to go that 'extra mile' to produce outstanding trackwork. It would help if you were prepared to spend extra time and effort learning how to use this product. Click here to learn more about our Craftsman Series of tools.
You must be logged in to post a review.
PARAMETER | VALUE | DETAILS |
---|---|---|
Default Turnout Length | 11.43" (290 mm) | This is the length of the turnout on the QuickSticks. Measured from end tie to end tie. |
Diverging Route Angle | 14.04 (Decimal) 14°/2'/24"(D/M/S) 1:4 (Ratio) | Decimal = Frog angle in decimal degrees D/M/S = Deg/Min/Sec Ratio = Frog angle expressed as a ratio |
Diverging Route Radius | 20" (508 mm) | The minimum radius in a straight turnout. |
Tie Spacing (Prototype) | 20" (508 mm) | Tie spacing center of tie to center of tie. |
Tie Size (Model) | L - 1.59" (40 mm) W - 0.14" (4 mm) H - 0.1" (3 mm) | The actual size of the tie. |
Tie Size (Prototype) | L - 8.5' (2.6 m) W - 9"(229 mm) H - 7" (178 mm) | The original tie size that the model was based on. |
Track Gauge | 0.894" (23 mm) | The distance between the stock rails. |
Size | L - 12.125" (308 mm) W - 5.125" (130 mm) H - 0.1" (3 mm) | The physical size of the product |
Weight | 0.126 lbs (0.057 kg) | |
Material | 2mm thick 3 Ply Baltic Birch |
Building Curved (and Straight) Turnouts With Fast Tracks TwistTies
TwistTies offer an alternative to building switches using an assembly fixture, PC Board ties, and solder. Instead, the switch is built using a pre-cut all wood tie lattice. This document provides detailed instructions.
Using the Frog Helper To Build Curved or Straight Turnout Frog Points
The Frog Helper tool works in the same manner as a full-sized assembly fixture but is specifically designed for building frog points. These instructions explain how to use the tool to construct curved or straight points and apply to all scales.
Using The Fast Tracks PointForm Tool To Build Switchpoints
The PointForm tool is not only used to file Frog points. It can also be used to file perfect switch points as well. Here is how it works.
How To Use Fast Tracks SweepSticks
How Fast Tracks SweepSticks can be used to precisely form a perfect radius in flextrack
Using The Fast Tracks Frog Helper To Build Curved Frog Points
The Fast Tracks Frog Helper tool can be used to build precision frogpoints for both straight and curved switches. Here we demonstrate how to build frogpoints for a curved turnout.
Using The Fast Tracks Frog Helper To Build Straight Frog Points
Building precision switch frog points is greatly simplified by using the Fast tracks Frog Helper tool along with the PointForm filing tool. This video demonstrates how.
Bending & Straightening Rail With The Fast Tracks Rail Roller
Bending rail into long smooth curves for curved trackwork can be challenging. The Fast Tracks Rail Roller tool makes this difficult job quick and easy. Plus it can straighten bent rail as well. This video shows you how it works.
Hand Laying Track Using Fast Tracks TwistTies
Fast Tracks TwistTies provides the craftsman with a way to build low cost, realistic looking and accurate all wood tie trackwork using laser cut wood ties, spikes & rail.
Using The Fast Tracks PointForm Tool To Build Frogpoints
Building highly accurate frogpoints is made fast and simple with the Fast Tracks PointForm tool. Here is a detailed demonstration showing you how it works.
Using The StockAid Tool To File The Base Of The Stockrail
Video demonstration on using the StockAid tool to remove the base of the stockrail.
Fast Tracks Video Channel
Visit our growing collection of track building demonstration videos
Fast Tracks Knowledge Base
In addition to an extensive Q&A section, we also offer a full library of track building documents.
Reviews
There are no reviews yet.