Browse Catalog
Image 2

Track Building Tools

Model Building Supplies

This is the first time I have ever hand laid track. I now feel more involved with my N scale layout and feel my layout is part of me rather than just a train layout.

-Kristopher B.

Image 3

Track Building Tools

Model Building Supplies

Your new process for producing copper ties is a Great Leap Forward compared to the old cutoff method. The ties are flat and the edges very clean...minimal filing required.

-Bob C.

Image 6

Track Building Tools

Model Building Supplies

At 54 years of age with aging eyesight I prepared myself for a difficult build. With the help and ease of the highly detailed information the build was done in 90mins.. that's it?? I was pleasantly surprised! On to the next one..

-Alexander P.

Image 1

Track Building Tools

Model Building Supplies

The three templates are as I expected, perfect. Our club purchased an HO #6, code 83 template and loved it... ...You have a great product at a very good price.

-Chris K.

Image 6

The Trifecta

The Ultimate Track Gauge

I have all of the jigs to construct museum quality track along with the many sweep sticks, curved and straight the same with twist ties, turnout twist ties for weys, double slip, three way and double crossovers making track laying a snap.

-Jim V.

Image 5

Track Building Tools

Model Building Supplies

Thanks for great products and lending a helping hand to the modeling community.

-Tony R.

Image 4

Track Building Tools

Model Building Supplies

Working carefully I am now making a turnout in about 45 minutes. The jig has cut down my costs in the number of turnouts I need and as my club needs to replace about 60 No.6 Shinohara turnouts this jig is going to make the replacements with ease.

-Robert C.

Image 5

Track Building Tools

Model Building Supplies

Your website, although it too is one of the best I've ever used, doesn't do justice to the actual product. Thank you for such an amazing contribution to the hobby.

-John C.

Image 1

Track Building Tools

Model Building Supplies

Very impressed with the products supplied and I look forward to some mass production! Very much appreciated! Just noted the turnout control products... I can see another order coming up soon.

-Mike M.

Image 4

Track Building Tools

Model Building Supplies

The kit is designed so that the frogs are isolated and DCC ready. Having scratch built a number of crossings, I highly recommend the Fast Tracks Diamond series crossings for ease of construction, for great detail, and for accuracy.

-Daryl I.

Image 2

Track Building Tools

Model Building Supplies

Fast Tracks dedication to produce their excellent line of products will now have Mt Albert Scale Models and lumber to complement their business. Thanks to both companies and hope to continue dealing with them.

-David C.

Image 6

The Trifecta

The Ultimate Track Gauge

Fast Tracks products and tutorials had me making 16 dual gauge turnouts with several variations that consisted of both gauges separating, standard gauge turnout with narrow gauge splitting off, and several other variations with ease and confidence.

-David C.

Image 6

Track Building Tools

Model Building Supplies

The first one worked so good I ordered the second one. Easy to use and in gauge every time.

-Fred S.

Image 3

Track Building Tools

Model Building Supplies

The only problem I have now is that I'm unsatisfied with the way everyone's track looks next to my Fast Tracks turnouts so I've decided to hand lay my three level layout with all Fast Tracks! You have a customer for life!

-Jeff D.

Image 5

Track Building Tools

Model Building Supplies

Image 6

Track Building Tools

Model Building Supplies

Image 2

Track Building Tools

Model Building Supplies

Image 4

Track Building Tools

Model Building Supplies

Image 3

Track Building Tools

Model Building Supplies

Image 6

The Trifecta

The Ultimate Track Gauge

The Trifecta

The Ultimate Track Gauge

Image 1

Track Building Tools

Model Building Supplies


OUR MOST POPULAR CATEGORIES

THIS IS PROBABLY WHAT YOU ARe Looking FOR


Fixture Built Trackwork

The Art of The Possible